How Long Should I Budget for Acquiring Office Space—Move-in Ready vs. Buildout?

  • eweinblatt3
  • Jun 25
  • 4 min read
Office Space

When planning a new office move, one of the most critical (and commonly underestimated) considerations is timing. Whether you’re expanding, relocating, or downsizing, understanding how long it will take to occupy your new space can directly affect your business operations, budget, and hiring plans.


The question isn’t just how long it takes to find a space, but rather: Should you go for a move-in-ready office or invest time in a full buildout?


Real estate advisor Ezra Weinblatt often emphasizes this distinction when working with clients across various industries:


“Choosing between move-in ready and buildout space is a strategic decision. It impacts not only occupancy timelines but also company culture, branding, and cash flow.”


To help you make an informed decision, let’s break down the timing, pros, and potential roadblocks for both options.


1. Move-in Ready Office Space: Quickest Path to Occupancy


Also referred to as "plug-and-play" or "turnkey," move-in ready office space typically comes furnished, wired, and sometimes even branded by the previous tenant.


🕒 Estimated Timeframe: 1 to 3 Months

This includes:

  • 1–2 weeks for property search

  • 2–4 weeks for lease negotiations

  • 2–6 weeks for move-in preparations


✅ Pros:

  • Faster occupancy: Ideal for companies facing tight deadlines.

  • Lower upfront costs: Minimal investment in construction or furnishings.

  • Reduced disruption: Smooth transition with limited downtime.


⚠️ Challenges:

  • Limited customization: You’re mostly adapting to an existing layout.

  • Compromise on location or design: Finding the perfect fit quickly may require trade-offs.


Ezra Weinblatt advises startups and scaling teams to consider this option when time-to-market or cash preservation is a priority:

“If you’re launching a product or expanding a team within 90 days, move-in-ready space buys you time and operational continuity.”


2. Buildout Office Space: Custom Fit, Longer Timeline


A buildout (or tenant improvement project) involves taking a raw or partially finished space and customizing it to your specific needs, often with input from architects, designers, and engineers.


🕒 Estimated Timeframe: 4 to 12 Months

  • 1–2 months for site selection and lease negotiations

  • 1–2 months for design and permitting

  • 2–6 months for construction

  • 1 month for move-in and setup


✅ Pros:

  • Tailored space: Reflects your brand, workflow, and company culture.

  • Efficient layout: Maximize productivity with functional design.

  • Long-term vision: Perfect for anchor tenants or larger teams.


⚠️ Challenges:

  • Delays are common: Permits, supply chain issues, and contractor schedules can shift timelines.

  • Higher upfront costs: Construction, design, and engineering expenses add up.

  • Complex coordination: Requires collaboration with architects, landlords, and city authorities.


According to Ezra Weinblatt, buildouts make the most sense when long-term occupancy and brand identity are critical:

“If your space is part of your identity—as it often is for law firms, creative agencies, or tech companies—a buildout delivers the control and uniqueness you’re looking for.”


3. Key Factors That Affect Your Timeline


Regardless of which path you choose, several factors can influence your office acquisition timeline:

🔹 Market Availability

  • In tight markets, move-in-ready spaces are in high demand and lease quickly.

  • Buildout spaces may take longer to secure, especially if zoned for mixed-use or undergoing renovations.


🔹 Lease Complexity

  • Move-in-ready deals are often shorter and simpler.

  • Buildout leases may include tenant improvement allowances (TIAs), phased construction schedules, and complex exit clauses.


🔹 City Permitting and Code Compliance

  • Cities like New York, San Francisco, and Boston are known for longer permitting processes.

  • Local building codes, environmental reviews, and fire safety checks can add weeks or months.


🔹 Landlord Experience

  • Experienced landlords can fast-track approvals and coordinate construction more efficiently.

  • Inexperienced landlords or those with financial issues may delay projects, especially on the buildout side.


Ezra Weinblatt highlights that doing due diligence on your landlord is just as important as inspecting the property:

“A landlord with a solid track record can make your buildout smoother. The wrong one can cause months of delays.”


4. What’s Right for You? A Simple Decision Framework


Here’s a quick decision matrix to guide your choice:

Factor

Move-in Ready

Buildout

Time to Occupy

1–3 months

4–12 months

Budget Flexibility

Low upfront cost

High upfront cost, long-term ROI

Customization Needs

Minimal

High

Operational Urgency

High

Medium to Low

Brand Expression

Limited

High

5. Plan Ahead: Budget Time, Not Just Money


Regardless of which route you take, budgeting time is as important as budgeting dollars. Unexpected delays, scope changes, or tenant improvement negotiation breakdowns can derail your schedule if you don’t plan buffers.


Ezra Weinblatt encourages tenants to start the office space process at least 6 to 12 months before your desired move-in date, especially if considering a buildout:


“Think of it like a product launch. There’s always version 1.0, 2.0, and things in between. Starting early gives you leverage and options.”


Final Takeaway


Acquiring office space is more than signing a lease—it's a strategic investment in your company’s growth, culture, and brand. Whether you choose a move-in-ready solution or a full buildout, the right timeline can make or break your transition.


For personalized insights on choosing the right path and planning your space strategy effectively, connect with Ezra Weinblatt via LinkedIn or visit EzraWeinblatt.com. His deep experience across office markets and deal structures can help you avoid pitfalls—and get the space you need, when you need it.

 
 
I an open to new and exciting opportunities.
Don't be shy, let's connect.

Contact Me

4600 North Park Avenue

Chevy Chase, MD 20815

ezra@unleashedgrp.com 

bottom of page